Position reference (PRS) 4/4
Environment & performance
DP control system
Posplot — excursion Normal
Grid 1.0 m
Vessel · thrusters & power 6/6 available
Live ASOG assessment
| Parameter | Value | Limit | Status |
|---|
Event log
Sensors
Power management
Automation & comms
Safety
Activity log
| Time | Source | Description |
|---|
DP Incident Form IMCA standard
Why QR
The DPO is on the bridge, under workload. Taking the checklist off paper and away from a clumsy login, putting it one tap away, is what makes the team actually use it every watch and every arrival on location.
Every completed checklist enters Logbook & compliance with time and signature — becoming an automatic audit trail, with no extra typing.
Available drills IMCA M117
Team competency
| Crew member | PRS loss | Blackout | Drive-off | Thruster failure |
|---|